Artisan Archive
Thread: Need Help Charging AV-21 Landspeeder
Page 1 of 1
-LouD-
Sun Apr 17, 2005 11:18 am
#1
just made an AV-21 landspeeder for somebody - he supplied me with the schematic and the power plant - what should i charge him?
thanks
thanks
Elyssa
Sun Apr 17, 2005 11:28 am
#2
If you're supplying the resources, I'd charge the fair value for the resources plus some extra for your time and skill.
faarsider
Tue Apr 19, 2005 9:21 am
#4
I think if someone just looted a av core and got the schematic from the mission 20k is a bit cheap imho for someone to tip the crafter I don't think 100k is out of the question as a goodwill gesture to the crafter
Emotemaster
Tue Apr 19, 2005 7:57 pm
#5
faarsider wrote:
I think if someone just looted a av core and got the schematic from the mission 20k is a bit cheap imho for someone to tip the crafter I don't think 100k is out of the question as a goodwill gesture to the crafter
Same resources as a swoop though.
faarsider
Wed Apr 20, 2005 5:34 am
#7
faarsider wrote:
I think if someone just looted a av core and got the schematic from the mission 20k is a bit cheap imho for someone to tip the crafter I don't think 100k is out of the question as a goodwill gesture to the crafter
emotemaster wrote
Same resources as a swoop though.
yeah but lets face it someone's gotta one cheap lowlife when they are saving 1.5-2m on the average selling price of an AV21 to not at least tip the crafter 100k
Dpjarrett
Wed Apr 20, 2005 6:06 am
#8
AV-21usesless resouces than a swoop; ituses thesame quantity ofresources as an X-34 landspeeder. Anyway, that's a fine point and not really that important.
I usually charge people 75k - 100k with best server resources and a guarentee of a 99% AV-21 or their money back. They're not just paying you for your resources; they're also paying you for the time you spend waiting around for them and the time actually spent crafting.
Corran950
Wed Apr 20, 2005 8:46 am
#9
I think i have charged between 100-150k to build the vehicle for someone when they offered the parts to me.
Animi
Thu Apr 21, 2005 7:17 am
#11
On my server, AV-21 Powerplants sell for 1.5M and AV-21 schematics go for about 250K (total for those parts = 1.75M). Completed AV-21s sell for 2M, which suggests to me the value for theadditional parts & labor is 250K, which is what I charge people (and they happily pay it).
Page 1 of 1