Armorsmith Archive
Thread: Whats the highest you've gotten an advanced comp segments base?
Page 1 of 1
jollyemu
Wed Aug 25, 2004 8:20 pm
#1
I'm doing 33% right now, 4% on each kinetic layer, i'm wondering if I can get kinetic layers to 5% base or is 4% the max?
Now if only I had some nice colat iron hehe 
Govo
Wed Aug 25, 2004 8:30 pm
#2
Not that I pretend to know as much as the veteran masters, but it seems you would need to have resources with 1000 in all required stats to reach the magic 5% base. Any comments/opinions? Although we all reach 4%, those extra decimals that we don't see clearly make a difference. Hell I havent cracked 70% base comp yet...Bah! (68-69 hehe)
Soenieh8r
Wed Aug 25, 2004 8:39 pm
#3
I have base segs with 5% that were made that one day when they tried the crafting revamp months ago. Now it would be near impossible to attain.
TalynMox
Wed Aug 25, 2004 10:28 pm
#4
Govo wrote:
Not that I pretend to know as much as the veteran masters, but it seems you would need to have resources with 1000 in all required stats to reach the magic 5% base. Any comments/opinions? Although we all reach 4%, those extra decimals that we don't see clearly make a difference. Hell I havent cracked 70% base comp yet...Bah! (68-69 hehe)
If I'm recalling correctly from the guide Jaato wrote, the theoretical maximum base resist on a layer is 7% (given 1000 in SR and OQ for all resources involved). Personally I have crafted 5% base Heat layers on chilastra (though I seem to have lost the touch of late...) I haven't tried Kinetic layers for base recently (we just had some very good spawns of resources for them) but I was able to hit 14% kinetic resist on them, so that would lead me to suspect that 4.8-5% base is achievable.
And Govo is exactly right, those hidden decimals can play quite a significant role. As our 35% base armour actually uses layers that read as 4% base.
My personal best is 72% without enhancers, but to do that I'm using very very high-end resources at all stages of the process. From memory only one resource has an SR below 500, with the rest being 800+, and all OQ's are above 950. If you like I'll try to craft a piece of it and post the stats for the resources I've used (assuming I manage it
)
Cheers,
Droci
Wed Aug 25, 2004 11:00 pm
#5
think 34% base is pretty much as high as we can get, with gated resources on the segment and all
Swerve99
Thu Aug 26, 2004 3:26 am
#6
34% Base with 3x Kinetic Layers
Best base effectiveness ever is 72%
AegolinAdaron
Thu Aug 26, 2004 4:42 am
#7
The maximum base resist on a layer is 5% (with perfect resources).
The maximum base resist on a 3-layered advanced composite segment is 37% (with perfect resources taking into account that some resources are gated).
The maximum base resist on 3-layered advanced composite is 75%(with perfect resources taking into account that some resources are gated).
Emily
Hermi_Odle
Thu Aug 26, 2004 6:21 am
#9
35 with base 5 layers
Makes 71 base with my assembly ressources. probably 72 or 73 with Swerves. I remember talking base 5 with him once.
Keuller
Thu Aug 26, 2004 12:53 pm
#10
On Layers, the theoretical max is 5% base.
On segments it's 25%. So together the best you could get is 40% base on a segment.
The best I've gotten on a segment alone is 21.4%, with my best energy layers: 35.66%.
On segments it's 25%. So together the best you could get is 40% base on a segment.
The best I've gotten on a segment alone is 21.4%, with my best energy layers: 35.66%.
Page 1 of 1