Architect Archive
Thread: Did Chemical Extractor Deed allways require 3 WALLS??? Or is this just a new bug?
Page 1 of 1
xtxShifter
Wed Dec 17, 2003 10:04 pm
#1
Every other medium harv only needs 3 structure modules, not 3 whole walls!
ZenDragonMLS
Wed Dec 17, 2003 10:16 pm
#2
Actually, it's the other way around. Before the latest patch (and I assume since the patch also but I haven't made any mediums), the schematics called for:
- mineral - 3 structural
- water - 3 structural (I think)
- chem, gas, flora - 3 walls
- mineral - 3 structural
- water - 3 structural (I think)
- chem, gas, flora - 3 walls
Zypen
Wed Dec 17, 2003 11:52 pm
#3
Its been a while, but yes, Chem, Floral and Solar required 3 walls, the others only required structure modules
Page 1 of 1