Architect Archive
Thread: How do I calc factory production time?
every item takes a different amount of time to make...
sorry, but the best way is to place the factory, load up the schimatic and start it running.. then from the radial menu chose examine. this will tell you how many items have been made on this run and how long each item takes to make.
only item i can remember off the top of my head is structure modules which take 64 seconds each... and walls which are 120 seconds each.
Look on the left side I think for "tools".
Or you pop the schematic in and use the EXAMINE window on the factory which will tell you how many seconds per item.
Isn't that just a little daft ? I mean a Medium Mineral has the same complexity (15) as a Wall Module, where is the logic ? I cannot for the life of me understand that.
Let me see, I put my structural modules, my ore, my metal, ok that should be it, no wait it's not a wall, it's that other complexity 15 item, oh right, so I add my Chemical, my steel, myGenerator Turbine (oops better make one), my small structural storage (oops another thing to make), my Light ore mining unit.......DOH
Bandola wrote:
Isn't that just a little daft ? I mean a Medium Mineral has the same complexity (15) as a Wall Module, where is the logic ? I cannot for the life of me understand that.
Let me see, I put my structural modules, my ore, my metal, ok that should be it, no wait it's not a wall, it's that other complexity 15 item, oh right, so I add my Chemical, my steel, myGenerator Turbine (oops better make one), my small structural storage (oops another thing to make), my Light ore mining unit.......DOH
That is why planning is so important. (But that said, even the myst ainal of us forget something sometimes and have to repeat the Homer mantra: D'OH)