Architect Archive
Thread: Are we going to lose business ??
They said "structure maintenance" specificallyso I assume that doesn't include power.
Its intended for the hurricane victims so I assume its a short term thing.
this is a great time to get going with lot swaps for fusion power generators![]()
free power for you
and yes the structures still take power /sigh having trouble finding it on shadowfire so most of my harvs are running with just enough to get them through the day lol
They said "structure maintenance" specificallyso I assume that doesn't include power.
Its intended for the hurricane victims so I assume its a short term thing.
Not so sure about short term, has any one seen what happened to New Orleans? The entire city has been devastated. They have actually decided that moving the city of New Orleans would be cheaper than repair. It looks like it may remain under water. My relative works for Florida Power and he will be dispatched to help with the efforts there but that wont be for at least 3 months if at all.
We can only guess. But I think 1-3 months is likely. By then SOE will probably either just turn it back on or find some other solution for the specific people affected by the hurricane.